NEW QUESTION # 32
What are the key features of using a low level code? Note: There are 2 correct answers to this question.

  • A. To determine the sequence in which materials are planned in MRP
  • B. To determine the priority of alternative components inside ATP
  • C. To determine how costs are rolled up by product costing
  • D. To determine the use of subitems inside material BOM (bill of material)

Answer: A,C


NEW QUESTION # 33
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.

  • A. They are created with exact times in Advanced Planning.
  • B. They are created together with the independent requirement for the finished product.
  • C. They are created on assembly level during the planning run.
  • D. They are only created for multilevel bill of material (BOM) structures.

Answer: A,C


NEW QUESTION # 34
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

  • A. Approved resources
  • B. Digital signature
  • C. Recipe approval
  • D. Batch record
  • E. GMPcompliant flag

Answer: B,C,D


NEW QUESTION # 35
You are a consultant on an SAP S/4HANA Cloud Greenfield project.
Which of the following aspects should you focus on to achieve maintain clean core data quality? Note: There are 2 correct answers to this question.

  • A. Efficiency
  • B. Accuracy
  • C. Timeliness
  • D. Stability

Answer: A,D


NEW QUESTION # 36
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Assign planned orders manually in the planning table.
  • B. Run PP/DS heuristics for repetitive manufacturing.
  • C. Run MRP with quota arrangement.
  • D. Run MRP with automatic selection of production version.

Answer: B,C


NEW QUESTION # 37
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have?
Note: There are 3 correct answers to this question.

  • A. Model a transportation lane and carrier selection in the location master.
  • B. Model a handling resource in the location master.
  • C. Model a separate inbound resource in the location master.
  • D. Model a separate resource in the production data structure.
  • E. Model a goods receipt time in the material master.

Answer: A,B,E

Explanation:
You can model goods receipt processing time in detailed scheduling by using one or more of the following options:
Model a handling resource in the location master: A handling resource is a special type of resource that represents the capacity required for goods movements within a location, such as loading, unloading, or staging. You can assign a handling resource to a location and define its availability and utilization. You can also specify the handling time per unit of material for each handling resource. The system will then calculate the goods receipt processing time based on the handling time and the quantity of the material.
Model a transportation lane and carrier selection in the location master: A transportation lane is a master data object that defines the relationship between two locations in terms of transportation modes, means of transport, transit times, and costs. You can assign a transportation lane to a location and define the transportation mode, such as truck, rail, or air. You can also specify the carrier selection, which is a rule that determines the preferred carrier for each transportation mode. The system will then calculate the goods receipt processing time based on the transit time and the carrier selection.
Model a goods receipt time in the material master: A goods receipt time is a parameter that defines the time required to post the goods receipt for a material after it arrives at the location. You can specify the goods receipt time in the material master record for each material and location combination. The system will then add the goods receipt time to the goods receipt processing time.
You cannot model goods receipt processing time in detailed scheduling by using the following options:
Model a separate resource in the production data structure: A resource is a master data object that represents the capacity required for production activities, such as machines, labor, or tools. You can assign a resource to a production data structure, such as a bill of material, a routing, or a production version. However, a resource cannot be used to model goods receipt processing time, as it is not related to goods movements.
Model a separate inbound resource in the location master: An inbound resource is a parameter that defines the maximum number of inbound deliveries that can be processed at a location at the same time. You can specify the inbound resource in the location master record for each location. However, an inbound resource cannot be used to model goods receipt processing time, as it is only a constraint for the number of deliveries, not the duration of the processing.


NEW QUESTION # 38
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Setup time
  • B. Float before production
  • C. Processing time
  • D. Pick time
  • E. Wait time

Answer: A,C,E


NEW QUESTION # 39
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. MRP creates a dependent requirement.
  • B. A sales order is delivered.
  • C. A sales order is created.
  • D. MRP creates a planned order.

Answer: C


NEW QUESTION # 40
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
Note: There are 2 correct answers to this question.

  • A. Scheduling agreement schedule line
  • B. Production order
  • C. Planned order
  • D. Purchase order

Answer: A,C


NEW QUESTION # 41
What is the difference between coproducts byproducts?Note: There are 2 correct answers to this question.

  • A. Only coproducts have a nonzero inventory valuation.
  • B. Only coproducts have movement type 531.
  • C. Only coproducts have movement type 101.
  • D. Only coproducts appear in the process or production order settlement rule.

Answer: C,D


NEW QUESTION # 42
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

  • A. Select a special procurement type inside the material master.
  • B. Define the special procurement type inside the material BOM (bill of material).
  • C. Use a special item category in your material BOM (bill of material).
  • D. Select a special MRP type inside the material master.

Answer: A,B


NEW QUESTION # 43
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

  • A. Material type
  • B. MRP type
  • C. MRP group
  • D. Procurement type

Answer: A,D


NEW QUESTION # 44
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. BOM header status
  • B. BOM component status
  • C. Lot size
  • D. Manufacturing date

Answer: C,D


NEW QUESTION # 45
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.

  • A. Routing
  • B. Production supply area
  • C. Work Center
  • D. Replenishment strategy

Answer: B,D


NEW QUESTION # 46
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

  • A. By Plant
  • B. By Period
  • C. By Industry
  • D. By Material Status

Answer: A,B

Explanation:
You can limit the validity of a BOM by plant and by period. The plant determines the organizational area of validity for the BOM, and you can assign the same BOM to different or further plants if the prerequisites are met. The period of validity for a BOM is restricted by the valid-from date and the valid-to date in the BOM header and item, which determine when the BOM becomes effective and when it ends. Reference: Validity of Bills of Material, BOM Item Validity


NEW QUESTION # 47
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.

  • A. Execute an infinite production planning run for the critical resources.
  • B. Determine a time period with available capacity on the planning board.
  • C. Increase the capacity supply in a timephased interval.
  • D. Form optimum sequences to reduce setup times.
  • E. Reduce the planning time interval.

Answer: B,C,D


NEW QUESTION # 48
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.

  • A. By order confirmation
  • B. By order release
  • C. By capacity planning
  • D. By mass processing

Answer: B,D

Explanation:
A material availability check can be triggered automatically for a production order by the following methods:
By mass processing: You can use the mass processing function to execute material availability checks for multiple production orders at once. You can use the Manage Production Orders app or the transaction COHV to perform mass processing. You can define the selection criteria and the scope of check for the orders to be checked. The system updates the availability status and the committed quantities for the checked orders.
By order release: You can configure the system to trigger a material availability check automatically when a production order is released. You can use the Customizing activity Define Checking Control to define the checking rule and the scope of check for the order release. The system updates the availability status and the committed quantities for the released order. Reference: Executing Material Availability Checks; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 83.


NEW QUESTION # 49
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.

  • A. Requirements profile
  • B. Planning strategy
  • C. Order type
  • D. Requirements type

Answer: B,D

Explanation:
The consumption of planned independent requirements by other requirements, such as sales orders or stock transport orders, depends on the planning strategy and the requirements type of the materials involved. The planning strategy defines the basic procedure for planning a material and determines whether the consumption is relevant for planning. The requirements type controls the consumption parameters, such as the consumption mode (forward, backward, or bidirectional), the consumption interval (period of time in which the consumption can take place), and the consumption indicator (whether the consumption reduces the planned independent requirements or not). Reference: Consumption of Planned Independent Requirements | SAP Help Portal, Planning Strategy | SAP Help Portal, Requirements Type | SAP Help Portal.


NEW QUESTION # 50
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

  • A. Specify a negative planning horizon.
  • B. Specify a negative offset time.
  • C. Specify a positive planning horizon.
  • D. Specify a positive offset time.

Answer: B

Explanation:
The planning strategy Finite Scheduling with Reverse allows you to schedule production orders backwards from the requested delivery date, taking into account the available capacity and material constraints. To allow scheduling the past, you need to specify a negative offset time in the strategy profile. The offset time defines how far in the past the system can schedule the production order start date. For example, if you specify an offset time of -5 days, the system can schedule the production order start date up to 5 days before the current date. This can help you to avoid late deliveries and reduce lead times.


NEW QUESTION # 51
Which stard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Work item
  • B. WBS item
  • C. Variablesize item
  • D. Preliminary item

Answer: C,D


NEW QUESTION # 52
where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 Correct answers to this question.

  • A. in the bill of material (BOM)
  • B. in the MRP controller
  • C. in the production version
  • D. In the routing
  • E. in the work centers

Answer: A,C,D

Explanation:
The system checks the master data selection settings during the creation of planned orders and production orders in the following places:
In the bill of material (BOM), the system checks the selection ID, which determines which alternative BOM is selected for the material. The selection ID can be maintained in the material master or in the production version.
In the routing, the system checks the selection ID, which determines which alternative routing is selected for the material. The selection ID can be maintained in the material master or in the production version.
In the production version, the system checks the validity period, the lot size, and the selection profile, which determine whether the production version is valid and applicable for the material. The production version combines the BOM and the routing for a material and can be maintained in the material master or in the production version master data. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 16; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 75.


NEW QUESTION # 53
Which of the following are features of the clean core dashboard? Note: There are 2 correct answers to this question.

  • A. Customers can grant access to the dashboard to partners.
  • B. Customers can use the dashboard in the dev test production tenants.
  • C. It can be used in all SAP S/4HANA Cloud editions.
  • D. It can be accessed by using SAP For Me.

Answer: A,D


NEW QUESTION # 54
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?
Note: There are 2 correct answers to this question.

  • A. Add the agreement to the quota arrangement mark it for MRP relevance.
  • B. Add the agreement to the source list mark it for MRP relevance.
  • C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Answer: B,C


NEW QUESTION # 55
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. BOM header status
  • B. BOM item status
  • C. Lot size
  • D. Manufacturing date

Answer: C,D

Explanation:
A multiple bill of material (BOM) is a type of BOM that allows for different combinations of components or raw materials for the same assembly or subassembly. The reason for different combinations of components in a multiple BOM could be the manufacturing date or the lot size. The manufacturing date determines the validity period of the BOM, which means that different BOMs can be valid for different time intervals. For example, a BOM can be changed due to a design modification or a change in the availability of components. The lot size determines the quantity-dependent explosion of the BOM, which means that different BOMs can be used for different production quantities. For example, a BOM can be optimized for different batch sizes or different production methods. Reference: Multiple BOM, BOM Explosion


NEW QUESTION # 56
Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.

  • A. Material
  • B. Plant
  • C. Work center
  • D. Production version

Answer: A,C


NEW QUESTION # 57
......


SAP C-TS422-2023 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Demand Management in SAP S
  • 4HANA: This section covers a comparison of production methods in various manufacturing environments.
Topic 2
  • Process Orders in SAP S
  • 4HANA: This section covers an introduction to process order components, processing, and relevant master data objects. Overview of Good Manufacturing Practices (GMP) features.
Topic 3
  • Lean Manufacturing in SAP S
  • 4HANA: This section covers repetitive manufacturing master data, line load planning, and Kanban systems.
Topic 4
  • Production Orders in SAP S
  • 4HANA: This section covers BOM item categorization, order status management, availability checks, routing selection, order type setup, and material handling processes.
Topic 5
  • Introduction to SAP S
  • 4HANA Supply Chain Planning: This part covers the background and motivation for SAP S
  • 4HANA, its main components, business applications, and user experience strategy.
Topic 6
  • Material Requirements Planning in SAP S
  • 4HANA: This part of the exam covers an examination of planning strategies, tools, and long-term planning concepts. Overview of MRP fundamentals and lot size procedures.
Topic 7
  • Introduction to SAP S
  • 4HANA Production Planning: This section covers an overview of production planning components, functions, and planning approaches. Exploration of emerging trends.
Topic 8
  • Managing Clean Core: This section covers the application of clean core principles to enhance business process agility, reduce adaptation efforts, and drive innovation in ERP systems.
Topic 9
  • Master Data in SAP S
  • 4HANA: This section covers the exploration of crucial production-related master data elements, with emphasis on bill of material, routing, and production version.
Topic 10
  • Capacity Planning in SAP S
  • 4HANA: This section covers a discussion of SAP S
  • 4HANA best practices, SAP HANA database concept, SAP Fiori user experience, and embedded analytics capabilities.

 

Authentic Best resources for C-TS422-2023 Online Practice Exam: https://www.prepawayete.com/SAP/C-TS422-2023-practice-exam-dumps.html

Get the superior quality C-TS422-2023 Dumps with explanations waiting just for you, get it now: https://drive.google.com/open?id=1puK8v7Y2w48-aVMEBwyjM3yF7Gua3r4X

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 )
From Monday to Saturday

Support: Contact now