Give You Free Regular Updates on LEED-AP-BD-C Exam Questions Mar 26, 2025
Achieve the LEED-AP-BD-C Exam Best Results with Help from USGBC Certified Experts
USGBC LEED-AP-BD-C Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
NEW QUESTION # 20
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the design process in Water Efficiency Prerequisite, Outdoor Water Use Reduction project teams will be able to
- A. estimate and optimize water use in landscape designs
- B. earn Sustainable Sites Credit, Rainwater Management
- C. earn Water Efficiency Credit, Water Metering
- D. estimate and optimize water use in outdoor fountains and pools
Answer: A
Explanation:
Explanation
The intent of the Water Efficiency Prerequisite, Outdoor Water Use Reduction is to reduce outdoor water consumption by either eliminating the need for irrigation or reducing the irrigation demand by at least 30% from the baseline. This prerequisite requires project teams to evaluate the project's outdoor water budget and irrigation water demand using the EPA WaterSense Water Budget Tool ora local equivalent. This will help project teams to estimate and optimize water use in landscape designs by selecting appropriate plant species and irrigation system efficiency.
References: = LEED v4: Building Design + Construction Guide, Outdoor Water Use Reduction Credits in LEED v4, Part Two: LEED v4 BD+C Outdoor Water Reduction and Related Credits
NEW QUESTION # 21
Which of the following cannot be classified as graywater?
- A. Water from toilets
- B. Water from showers
- C. Water from lavatory faucets
- D. Water from kitchen sinks
Answer: A
Explanation:
This option requires the project to classify water from toilets as blackwater, not graywater, because it contains human waste and pathogens that pose a health risk1. Graywater is defined as wastewater that contains fewer contaminants than blackwater, such as water from showers, sinks, and washing machines2. Graywater can be reused for non-potable purposes, such as irrigation and toilet flushing, after appropriate treatment3.
References: = LEED v4: Building Design + Construction Guide, Greywater Systems, Recycled content.
NEW QUESTION # 22
A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:
- A. The project is a Federal Renewal Community site
- B. At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed
- C. The site is a brownfield as defined by the Environmental Protection Agency
- D. At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed
Answer: B
Explanation:
For Location and Transportation (LT) Credit: High Priority Site, Option 1: Historic District, the project team must confirm that at least 75% of land areas within 1/2 mile (0.80 km) are previously developed (B). This demonstrates that the project site is part of an infill area, supporting LEED's goal to revitalize and use previously developed urban spaces while protecting undeveloped land. Options like Federal Renewal Community status (C) or brownfield designation (D) apply to different site categories.
NEW QUESTION # 23
What nonroof measure contributes to the achievement of Sustainable Sites Credit, Heat Island Reduction, Option 1. Nonroof and Roof?
- A. Provide shade with structures covered by energy generation systems
- B. Use a high reflectance roof finish
- C. Install artificial turf
- D. Locate a minimum of 75% of parking spaces under cover
Answer: A
Explanation:
Detailed
Providing shade with structures that incorporate energy generation systems (e.g., photovoltaic panels) not only reduces heat island effects but also supports renewable energy credits. LEED encourages such multi-functional strategies that address multiple sustainability objectives.
NEW QUESTION # 24
Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?
- A. C, D, E
- B. B, C, D
- C. A, B, D
- D. A, B, C
Answer: A
Explanation:
Quality views are defined in LEED as those which consist of multiple elements of nature, weather, or movement that allow for a connection beyond the interior space. Views that allow a clear line of sight to the exterior via vision glazing, with a view factor of 3 or greater, qualify for this credit. Fixed glazing in common spaces can also contribute to this credit.
NEW QUESTION # 25
What percentile of runoff from a regional development of an office building must a project manage on site by using low-impact development and green infrastructure to achieve three points under the Sustainable Sites Credit-Rainwater Management, Option 1. Percentile of Rainfall Events?
- A. 100th percentile
- B. 98th percentile
- C. 85th percentile
- D. 95th percentile
Answer: D
Explanation:
Detailed
To achieve three points under the Rainwater Management credit, projects must manage the 95th percentile of regional rainfall events on site. This approach minimizes the impact of stormwater runoff on local watersheds and supports the use of low-impact development (LID) techniques such as bioswales, green roofs, and rain gardens.
NEW QUESTION # 26
If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle Facilities?
- A. Five
- B. Ten
- C. Four
- D. Three
Answer: A
Explanation:
According to the LEED v4: Building Design + Construction Guide, the Location and Transportation Credit, Bicycle Facilities has two options: Option 1. Bicycle Network and Storage and Option 2. Reduced Parking Footprint. Option 1 requires the project to provide short-term bicycle storage for at least 2.5% of all peak visitors, and long-term bicycle storage for at least 5% of all regular building occupants. Short-term bicycle storage must be within 100 ft (30 m) walking distance of any main entrance, and long-term bicycle storage must be within 300 ft (90 m) walking or bicycling distance of any functional entry. Option 2 requires the project to provide short-term bicycle storage for at least 2.5% of all peak visitors, and long-term bicycle storage for at least 5% of all regular building occupants, and also reduce the total parking capacity by at least 20% from the base ratios. Both options can earn one point under this credit1.
If a commercial building is considered to have 100 peak visitors in a day, the minimum number of short-term bicycle storage spaces that must be provided to earn one point under Option 1 or Option 2 is 2.5% of 100, which is 2.5, rounded up to 3. However, the project must also provide long-term bicycle storage for at least 5% of all regular building occupants, which is not given in the question. Therefore, the correct answer is C, five, which is the minimum number of short-term bicycle storage spaces that must be provided to earn one point under Option 1 or Option 2, regardless of the number of regular building occupants. Reference: LEED v4: Building Design + Construction Guide, Location and Transportation Credit, Bicycle Facilities, Requirements1
NEW QUESTION # 27
Which individual occupant lighting control meets the requirements of Indoor Environmental Quality Credit, Interior Lighting?
- A. Three Level (on, 50%, off)
- B. Three Level (on, 75%, off)
- C. Two Level (on, off)
- D. Three Level (on, 25%, off)
Answer: D
Explanation:
The Indoor Environmental Quality Credit, Interior Lighting, requires the project team to provide individual occupant lighting control for at least 90% of the individual occupant spaces, or at least 50% of the shared multi-occupant spaces. The lighting control must enable occupants to adjust the lighting to suit their individual tasks and preferences, and must have at least three lighting levels, excluding off1. Therefore, a three level (on, 25%, off) lighting control meets the requirements of this credit, while a two level (on, off) lighting control does not. A three level (on, 50%, off) or a three level (on, 75%, off) lighting control may also meet the requirements, depending on the lighting power density and the daylight availability in the space2.
Reference:
* LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit: Interior Lighting, page 7071
* Interior lighting | U.S. Green Building Council3
NEW QUESTION # 28
In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?
- A. Flooring
- B. Wet applied products
- C. Composite wood
- D. Furniture
Answer: D
Explanation:
Explanation
Furniture is the only type of product that needs to be evaluated for both VOC content and VOC emissions in the LEED BD+C Low-Emitting Materials credit.Flooring, composite wood, and wet applied products only need to meet the VOC content requirements, while other types of products, such as ceilings, walls, thermal and acoustic insulation, and exterior applied products, only need to meet the VOC emissions requirements1.
References:
* LEED v4: Building Design + Construction Guide
* Low-Emitting Materials | U.S. Green Building Council
NEW QUESTION # 29
Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?
- A. Floor decking
- B. Exterior glazing
- C. Asbestos insulation
- D. Plumbing fixtures
Answer: A
Explanation:
The reuse calculation for MR Credit Building Life-Cycle Impact Reduction includes the surface area of structural elements that are reused in place or salvaged and reinstalled, such as floor decking, columns, beams, and roof decking. Exterior glazing and plumbing fixtures are not considered structural elements and are not included in the reuse calculation. Asbestos insulation is a hazardous material that should be removed and disposed of properly, not reused. References: MR Credit Building Life-Cycle Impact Reduction, LEED v4 Reference Guide for Building Design and Construction123
NEW QUESTION # 30
When planning a water-efficient landscape design, the designer should consider including
- A. permeable pavement
- B. potable water
- C. native vegetation
- D. sprinkler system
Answer: C
Explanation:
The best answer is C. native vegetation. This is because:
*Native vegetation is adapted to the local climate and soil conditions, and therefore requires less water than non-native plants1.
*Native vegetation also supports local biodiversity, reduces erosion, and enhances the aesthetic value of the landscape2.
*Potable water is not a good option for water-efficient landscape design, as it is a scarce and valuable resource that should be conserved for human consumption and hygiene3.
*Sprinkler systems are not a good option for water-efficient landscape design, as they can waste a lot of water through evaporation, runoff, and overspray4. Drip irrigation or micro-sprinklers are more efficient methods of watering plants.
*Permeable pavement is not a good option for water-efficient landscape design, as it is not a plant-based element, but a hardscape feature that allows water to infiltrate into the ground. Permeable pavement can reduce stormwater runoff and pollution, but it does not directly contribute to water conservation in the landscape.
References: 1: Water Efficient Landscaping Ideas: 5 Water Wise Tips 2: [Native Plants for Water Conservation] 3: [Water Conservation | US EPA] 4: [Sprinkler Irrigation - an overview | ScienceDirect Topics] : [Drip Irrigation - an overview | ScienceDirect Topics] : [Permeable Pavement - an overview | ScienceDirect Topics] : [Permeable Pavement Benefits and Costs]
NEW QUESTION # 31
The LEED project has a main entrance and two service entrances in an alley behind the building. Which entrances need non-smoking signage and at what maximum distance from the door(s) can the non-smoking signage be posted?
- A. At the main entrance and the two service entrances, 25 ft. (7.5 m) from the doors
- B. At the main entrance, 10 ft. (3 m) from the door
- C. At the main entrance, 25 ft. (7.5 m) from the door
- D. At the main entrance and the two service entrances, 10 ft. (3 m) from the doors
Answer: D
Explanation:
According to the LEED v4 Reference Guide for Building Design and Construction, no smoking signage must be placed within 10 feet (3 meters) of every building entrance, except for alarmed emergency exits. This applies to both the main entrance and the service entrances, regardless of their location or frequency of use. The signage is intended to communicate the no-smoking policy to occupants and visitors and prevent environmental tobacco smoke from entering the building. Reference: EQ Prerequisite Environmental Tobacco Smoke Control, LEED v4 Reference Guide for Building Design and Construction123
NEW QUESTION # 32
A building owner installs a building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the installation?
- A. Energy and Atmosphere Credit, Enhanced Refrigerant Management
- B. Energy and Atmosphere Credit, Demand Response
B Energy and Atmosphere Credit, Ongoing Commissioning - C. Energy and Atmosphere Credit, Enhanced Commissioning
Answer: B
Explanation:
This is because:
A building automation system (BAS) is a system that controls and monitors various aspects of a building's operation, such as lighting, heating, ventilation, air conditioning, security, fire alarm, and energy management1.
A BAS can allow programmable load control (PLC), which is the ability to adjust the power consumption of devices or equipment based on a schedule, a sensor, or an event2. PLC can help reduce the energy demand and cost of a building by optimizing the use of resources and avoiding unnecessary or wasteful consumption3.
The LEED AP BD+C V4 credit for Demand Response requires that buildings have a demand response program that can respond to changes in electricity prices or supply by reducing or shifting the demand for electricity4. A BAS can enable such a program by allowing PLC and other features that can modulate the power usage of devices or equipment in response to market signals or internal conditions.
Therefore, installing a BAS to allow PLC can help achieve the Energy and Atmosphere Credit for Demand Response by reducing the energy demand and cost of a building.
NEW QUESTION # 33
A project team develops a site plan for a school project with an athletic field and a playground with real grass.
In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:
- A. May include the playground but must exclude the athletic field
- B. Must include the playground but exclude the athletic field
- C. Must include the athletic field and playground
- D. May include or exclude the athletic field and the playground
Answer: D
Explanation:
For the Water Efficiency (WE) Prerequisite: Outdoor Water Use Reduction, athletic fields and playgrounds are considered special landscape areas and can be optionally included in landscape area calculations. This flexibility (D) allows teams to decide based on the unique water needs of these areas, as athletic fields often require extensive watering for maintenance. LEED recognizes these areas' high water demand and provides an exception, acknowledging the potential challenges in reducing water for such intensive-use spaces.
NEW QUESTION # 34
What is the reference standard that defines the requirements for LEED energy modeling?
- A. Core Performance Guide
- B. ASHRAE 90.1-2010 Appendix G
- C. ASHRAE Advanced Energy Design Guide
- D. ASHRAE 62.1-2010
Answer: B
Explanation:
Detailed
ASHRAE 90.1-2010 Appendix G is the reference standard used for energy modeling in LEED projects. It establishes guidelines for baseline building performance and energy simulation comparisons, allowing project teams to demonstrate energy performance improvements relative to code-minimum buildings.
NEW QUESTION # 35
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
- A. Healthcare
- B. Schools
- C. Core and Shell
- D. Retail
Answer: A
Explanation:
Healthcare projects are required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations. This is because healthcare projects have different daylighting needs and challenges than other project types, and the perimeter area is more likely to have access to natural light and views. The perimeter floor area is defined as the regularly occupied spaces within 15 feet (4.5 meters) of the exterior wall that meets the minimum glazing requirements. References:
* LEED v4 for Building Design and Construction, p. 6021
* LEED v4 for Building Design and Construction, p. 362
NEW QUESTION # 36
......
Detailed New LEED-AP-BD-C Exam Questions for Concept Clearance: https://www.prepawayete.com/USGBC/LEED-AP-BD-C-practice-exam-dumps.html
Provide LEED-AP-BD-C Practice Test Engine for Preparation: https://drive.google.com/open?id=1j9elgdvdeFdQ799mOEmjM5UtfOQ1eXfx