Try C-OCM-2503 Exam Valid Dumps with Instant Download Free Updates
C-OCM-2503 Dumps First Attempt Guaranteed Success
NEW QUESTION # 47
The stakeholder analysis in a cloud project reveals that some individual stakeholders belong to the
"supporters" category. Which strategies should you use? Note: There are 2 correct answers to this question.
- A. Assign them project roles to increase their influence on the success of the project
- B. Involve them in project activities to facilitate design decisions
- C. Use their positive attitude to influence others in their area of responsibility
- D. Ask them to exert pressure on the skeptics in their area of responsibility
Answer: A,B
NEW QUESTION # 48
What are typical agenda topics for a change network kick-off meeting? Note: There are 2 correct answers to this question.
- A. Input of the project sponsor on the importance of the project for the company
- B. Input of the project manager on experiences with change networks in previous projects
- C. Input of the subproject managers on challenges and hurdles in their respective area of responsibility
- D. Input of the change manager on the change network approach and the change agent role
Answer: A,D
Explanation:
A change network kick-off meeting in SAP OCM launches the change agent network. Option C is correct because the change manager outlines the approach and agent roles, setting expectations. Option D is correct as the sponsor's input underscores the project's strategic value, motivating agents. Option A is incorrect- subproject managers focus on technical areas, not the change network. Option B is also incorrect; past experiences may inform planning but aren't a typical agenda item for agents. The focus is on role clarity and project significance.
"The change network kick-off includes the change manager defining roles and the sponsor reinforcing project importance to align and motivate agents" (SAP Activate, Change Network Setup).
NEW QUESTION # 49
An SAP cloud project is supported by an external change management advisor and an internal change manager in a delivery role. How would you assign the responsibilities? Note: There are 3 correct answers to this question.
- A. The internal change manager executes change management tasks, such as change communication activities.
- B. The internal change manager ensures that an ongoing change management know-how transfer is established.
- C. The external change manager provides the change management approach and delivers "best practice" tools and templates.
- D. The external change manager takes over the holistic responsibility for the change management support of the project.
- E. The external change manager develops the overall plans and concepts for change management in the project.
Answer: A,B,C
Explanation:
In SAP projects, external advisors bring expertise, while internal managers operationalize it. Option A is correct because the internal change manager, embedded in the organization, ensures knowledge transfer for sustainability. Option C is correct as the internal manager executes tasks (e.g., communication) due to their proximity to stakeholders. Option E is correct because the external advisor provides strategic approaches and tools (e.g., templates from SAP Activate), leveraging their expertise. Option B is incorrect-developing plans is collaborative, not solely external. Option D is incorrect; holistic responsibility is shared, not fully outsourced. This division balances external best practices with internal execution.
"External advisors provide best-practice approaches and tools, while internal change managers execute activities and ensure knowledge transfer for long-term capability" (SAP Activate Methodology, Change Management Roles and Responsibilities).
NEW QUESTION # 50
What are the benefits of a change story for an SAP cloud project? Note: There are 2 correct answers to this question.
- A. As the change story is updated on an ongoing basis, it provides important input for refining the change plan.
- B. Elaborating and aligning the change story with the key project stakeholders helps to create a shared understanding of the project.
- C. The change story serves as the basis for all project-related communication assets, ensuring consistent messaging.
- D. Integrating key opponents into the development of the change story fosters an attitude change and reduces resistance.
Answer: B,C
Explanation:
The change story drives alignment and consistency. Option A is correct because it standardizes communication assets (e.g., presentations). Option B is correct as collaboration with stakeholders builds consensus. Option C is incorrect-opponents may resist inclusion, and it's not a primary benefit. Option D is incorrect; the change story informs, but updates don't directly refine the plan.
Extract from SAP OCM Concepts: The change story ensures consistent messaging and shared understanding (SAP OCM Framework, Communication).
NEW QUESTION # 51
Which general recommendations help to deliver change management successfully? Note: There are 2 correct answers to this question.
- A. Only use standardized tools and templates
- B. Be user-centric and empathetic
- C. Calculate the return on investment (ROI) for change management activities
- D. Establish trustful cooperation with project management
Answer: B,D
Explanation:
Successful change management in SAP OCM hinges on people and collaboration. Option C is correct-being user-centric and empathetic (e.g., addressing a user's fear of change with tailored support) ensures adoption by meeting emotional and practical needs, not just pushing info. Option D is correct as trustful cooperation with project management-e.g., aligning OCM with milestones-integrates efforts, like syncing training with testing, avoiding silos.
Option A is incorrect-standard tools help, but flexibility (e.g., custom workshops) is key; rigidity limits impact. Option B is incorrect-ROI calculation is impractical for OCM's qualitative benefits (e.g., morale); focus is on outcomes, not finance. SAP OCM thrives on empathy and partnership.
"Deliver change management successfully by being user-centric and empathetic, and fostering trustful cooperation with project management" (SAP OCM Framework, Success Recommendations).
NEW QUESTION # 52
How would you describe the different dimensions of SAP's organizational change management framework?
Note: There are 3 correct answers to this question.
- A. Change communication encompasses activities to provide relevant project information to the different stakeholder groups at the right time.
- B. Change effectiveness contains activities that can be applied to evaluate the impact of change management interventions.
- C. Change leadership involves activities to enable all management levels to handle the cloud implementation and deal with resistance.
- D. Change strategy covers activities to set up change management properly.
- E. Change realization includes activities to realize the business benefits associated with the cloud implementation.
Answer: C,D,E
Explanation:
SAP's OCM framework has key dimensions. Option A is correct-change strategy sets the foundation (e.g., planning, scoping). Option B is correct as realization focuses on delivering benefits (e.g., adoption). Option D is correct because leadership equips managers to manage change and resistance. Option C is incomplete- effectiveness evaluates impact but isn't fully defined here. Option E is a tactic, not a dimension; communication supports other dimensions.
Extract from SAP OCM Concepts: SAP OCM includes strategy, realization, and leadership as core dimensions (SAP OCM Framework).
NEW QUESTION # 53
What are the key target groups of the learning needs analysis of an SAP project?
- A. Project team and business users
- B. Business users and suppliers
- C. Managers and employees
- D. IT team and software providers
Answer: A
Explanation:
The learning needs analysis (LNA) in an SAP project identifies training requirements for those directly involved or impacted. Option D is correct because the project team (e.g., implementers) and business users (e.
g., end-users) are the primary groups needing enablement to execute and adopt the solution. Option A is too broad-managers and employees include non-users. Option B is incorrect; software providers are external and not typically trained. Option C is incorrect-suppliers are not primary targets for internal system training.
Extract from SAP OCM Concepts: The LNA targets project team and business users to ensure effective enablement (SAP Activate, Enablement Workstream).
NEW QUESTION # 54
Why is it important to develop an enablement strategy for an SAP cloud project? Note: There are 3 correct answers to this question.
- A. It ensures the definition of the role-based course catalog for the project
- B. It supports the timely assignment of suitable trainers to enablement courses
- C. It helps to prepare all enablement related activities in a timely manner
- D. It provides a clear direction for all enablement activities
- E. It serves as baseline to deliver enablement on time, to budget, and to quality
Answer: C,D,E
Explanation:
An enablement strategy in SAP OCM (Prepare/Explore) ensures users are ready for the cloud system. Option A is correct because it prepares activities (e.g., training schedules) timely-e.g., planning sessions before Realize avoids last-minute rushes. Option B is correct as it baselines delivery-on time (before go-live), to budget (resource allocation), and to quality (effective materials)-e.g., ensuring training meets adoption goals. Option D is correct because it directs activities (e.g., "focus on key users first"), aligning efforts with project needs.
Option C is incorrect-a course catalog is an output, not the strategy's purpose. Option E is incorrect; trainer assignment is logistical, not a core strategic benefit. SAP OCM uses the strategy for planning and execution clarity.
"An enablement strategy ensures timely preparation, provides a delivery baseline, and directs all enablement activities for user readiness" (SAP Activate, Enablement Strategy Importance).
NEW QUESTION # 55
How would you prepare to conduct a detailed change impact analysis workshop? Note: There are 2 correct answers to this question.
- A. Invite the appropriate workshop participants, for example process owners, subject matter experts, and key users
- B. Select one relevant impact dimension to be analyzed, for example process, technology, organization, or people
- C. Schedule individual upfront meetings with all workshop participants to collect initial insights
- D. Create a template with the relevant business processes broken down to a suitable level for the discussion
Answer: A,D
Explanation:
Preparing for a detailed change impact analysis (CIA) workshop, typically conducted in the SAP Activate Explore or Realize phase, requires careful planning to ensure actionable outcomes. Option A is correct because inviting the right participants-process owners (who understand current workflows), subject matter experts (SMEs, who provide technical/process depth), and key users (who represent end-user perspectives)- ensures a comprehensive assessment of impacts across affected areas. Their diverse insights are critical for identifying specific changes at a granular level, such as how a process shift affects daily tasks or system usage. Without these stakeholders, the workshop risks missing critical details or buy-in, undermining its effectiveness.
Option B is correct because creating a template with relevant business processes broken down to a suitable level (e.g., subprocesses like "order entry" within "order-to-cash") provides a structured framework for discussion. This template might include columns for as-is vs. to-be states, impact severity, and affected roles, enabling participants to systematically evaluate changes. It ensures focus and consistency, preventing the workshop from becoming a free-for-all discussion, and aligns with SAP's methodical approach to CIA.
Option C is incorrect because scheduling individual upfront meetings with all participants is impractical and time-consuming for a detailed CIA, which builds on prior high-level analysis. While some pre-workshop input might be gathered, the workshop itself is the collaborative forum for insights, not pre-meetings. Option D is incorrect because limiting the analysis to one dimension (e.g., only "process") contradicts the holistic nature of a detailed CIA, which assesses multiple dimensions (process, technology, organization, people) to capture the full scope of change. SAP OCM emphasizes stakeholder inclusion and structured tools for detailed CIA preparation.
"Preparation for a detailed change impact analysis workshop involves inviting key stakeholders such as process owners, SMEs, and key users, and providing a structured template of business processes to guide the assessment of impacts across all dimensions" (SAP Activate Methodology, OCM Workstream, Detailed CIA Preparation).
NEW QUESTION # 56
What is the added value of a high-level change impact analysis? Note: There are 3 correct answers to this question.
- A. It allows the change manager to derive appropriate activities, focusing the resources on key action areas.
- B. It provides an initial systematic overview of the amount and the nature of the upcoming changes.
- C. It enables the project manager to identify opponents in highly impacted units and adjust the stakeholder analysis accordingly.
- D. It delivers input for communication activities, making the implications of the project more tangible.
- E. It reveals key project risks that can be integrated into the project's risk management at an early stage.
Answer: A,B,E
Explanation:
A high-level change impact analysis (CIA) is conducted early in an SAP project (typically in the Prepare or Explore phase of SAP Activate) to assess the scope and scale of changes. Option A is correct because identifying risks (e.g., resistance or resource gaps) early allows integration into the project's risk management strategy. Option B is correct as it provides a broad overview of change impacts across business units, processes, and people, setting the stage for detailed analysis later. Option D is correct because it helps the change manager focus efforts on high-impact areas, such astraining or communication for affected groups.
Option C is incorrect-while it may indirectly highlight resistance, identifying opponents is a function of stakeholder analysis, not the CIA's primary purpose. Option E is also incorrect; communication inputs are derived from the CIA but are not its core added value-tangible implications are a byproduct, not the focus.
Extract from SAP OCM Concepts: The high-level CIA aligns with SAP Activate's Prepare phase, providing a foundation for risk mitigation and resource allocation (SAP Activate, OCM Framework).
NEW QUESTION # 57
What are typical strategies for aligning leadership in an SAP cloud project? Note: There are 3 correct answers to this question.
- A. Involve business leaders in workshops to identify change impacts and to derive activities to allow a smooth transition
- B. Reduce the bonus pay-out for resistant business leaders to foster a more positive attitude and change supportive behavior
- C. Align the business goals and incentives with the project objectives for business leaders to avoid goal conflicts
- D. Involve business leaders actively in key communication activities, such as roadshows, townhalls, or testimonials to enhance their visibility
- E. Offer opportunities for leaders to openly address issues and concerns, for example Q&A sessions with the project managers
Answer: C,D,E
Explanation:
Aligning leadership in SAP OCM ensures top-down support for cloud projects. Option B is correct because Q&A sessions with project managers allow leaders to voice concerns (e.g., about standardization), fostering trust and alignment through dialogue. Option C is correct as involving leaders in communication (e.g., speaking at townhalls) leverages their authority to promote the project, boosting visibility and credibility.
Option D is correct because aligning goals and incentives (e.g., tying performance metrics to project success) minimizes conflicts, ensuring leaders prioritize the implementation.
Option A is incorrect-reducing bonuses is punitive, risks escalating resistance, and isn't an SAP OCM practice; positive reinforcement is preferred. Option E is incorrect; while leaders might join workshops, identifying impacts is typically for process owners/SMEs-leadership focuses on sponsorship, not derivation.
SAP OCM stresses engagement and alignment over coercion.
"Align leadership through Q&A opportunities, active communication roles, and goal alignment to secure their support and influence" (SAP Activate, Leadership Alignment Strategies).
NEW QUESTION # 58
Why is the implementation of an SAP cloud solution a holistic business transformation?
- A. It leads to changes in the technology, process, organization, and people dimensions.
- B. It impacts both employees and managers.
- C. It leads to significant changes of the existing IT landscape.
- D. It impacts the collaboration with suppliers and customers.
Answer: A
Explanation:
An SAP cloud implementation is holistic because it affects multiple facets of the organization, not just isolated areas. Option C is correct as it encapsulates the four key dimensions of transformation: technology (new cloud systems), process (best-practice adoption), organization (structural adjustments), and people (behavioral change). This aligns with SAP's view that cloud projects drive end-to-end change. Option A is too narrow-supplier/customer collaboration is just one potential impact. Option B is also limited; impacting employees and managers is part of the "people" dimension but doesn't cover the full scope. Option D focuses only on IT, ignoring process, organization, and people changes. SAP OCM emphasizes a comprehensive approach totransformation, making C the definitive answer.
"SAP cloud implementations are holistic transformations, impacting technology, processes, organizational structures, and people, requiring a coordinated change management approach across all dimensions" (SAP Organizational Change Management Framework, Overview).
NEW QUESTION # 59
Which approach is suitable for conducting a communication needs analysis?
- A. Setting up the analysis as a project activity, because it allows fast execution and fosters team spirit
- B. Interviewing selected business users to explore their individual communication needs, because aggregating this data reveals important insights
- C. Conducting workshops in all impacted business units, because it gives the employees the feeling of being heard
- D. Approaching managers or dedicated experts, because it is efficient and avoids unrealistic expectations
Answer: B
Explanation:
A communication needs analysis in SAP OCM identifies what information stakeholders require, when, and how. Option B is correct because interviewing selected business users (e.g., key users from different units) allows the change manager to explore individual needs-such as preferred channels (email vs. meetings) or content (updates vs. training)-and aggregate these into a comprehensive plan. For instance, a finance user might need detailed process updates, while a warehouse user wants quick system tips. This targeted, qualitative approach uncovers nuances that broad methods miss, ensuring tailored communication that drives adoption.
Option A is incorrect-relying only on managers/experts is efficient but risks missing end-user perspectives, leading to top-down assumptions and unmet needs. Option C is vague; "project activity" isn't a method, and speed/team spirit aren't primary goals-accuracy is. Option D is impractical-workshops across all units are resource-intensive and may raise expectations without delivering actionable insights, diluting focus. SAP OCM favors user-centric, data-driven methods like interviews for communication planning.
"Conduct a communication needs analysis by interviewing selected business users to gather and aggregate insights, ensuring messages meet specific stakeholder requirements" (SAP OCM Framework, Communication Needs Analysis).
NEW QUESTION # 60
How would you describe the different dimensions of SAP's organizational change management framework?
Note: There are 3 correct answers to this question.
- A. Change communication encompasses activities to provide relevant project information to the different stakeholder groups at the right time.
- B. Change effectiveness contains activities that can be applied to evaluate the impact of change management interventions.
- C. Change leadership involves activities to enable all management levels to handle the cloud implementation and deal with resistance.
- D. Change strategy covers activities to set up change management properly.
- E. Change realization includes activities to realize the business benefits associated with the cloud implementation.
Answer: C,D,E
NEW QUESTION # 61
What advice promotes the successful implementation of change enablement activities? Note: There are 3 correct answers to this question.
- A. Establish an enablement team with clear roles, responsibilities, skills and time to carry out enablement well
- B. Assign an enablement lead that reports into the steering committee to foster high management attention on enablement activities
- C. Provide a comprehensive enablement strategy guiding the impacted business areas through all enablement activities
- D. Integrate key enablement activities into the overall project plan to increase attention and to avoid critical activities being overlooked
- E. Ensure that the enablement team actively participates in the fit-to-standard workshops to derive learning needs for impacted user groups
Answer: A,C,D
Explanation:
Successful change enablement in SAP OCM ensures users adopt the system effectively. Option B is correct because an enablement team with defined roles (e.g., trainer), skills (e.g., content creation), and time ensures professional execution, avoiding ad-hoc efforts. Option C is correct as a comprehensive strategy (e.g., outlining training phases, tools) guides business areas systematically, aligning enablement with project goals.
Option D is correct because integrating enablement into the project plan (e.g., scheduling training before go- live) ensures visibility and prioritization alongside technical tasks.
Option A is incorrect-reporting to the steering committee overcomplicates governance; the enablement lead coordinates with project management, not executives directly. Option E is incorrect; fit-to-standard workshops (Explore phase) involve process owners/SMEs, not the enablement team, whose role is delivery, not needs derivation. SAP OCM emphasizes structure and integration for enablement success.
"Promote enablement success with a skilled team, a comprehensive strategy, and integration into the project plan to ensure effective user preparation" (SAP Activate, Enablement Best Practices).
NEW QUESTION # 62
What are the key benefits of defining clear enablement roles in an SAP project? Note: There are 3 correct answers to this question.
- A. It increases transparency and visibility in the project team and helps to facilitate decision-making processes
- B. It gives enablement team members a greater sense of ownership and increases team accountability
- C. It describes the enablement strategy and gives clear directions for the enablement team
- D. It ensures that everyone involved in enablement activities knows what needs to be done
- E. It provides the enablement team members with the required tools to execute enablement activities
Answer: A,B,D
Explanation:
Defining clear enablement roles (e.g., enablement lead, trainer) in SAP OCM ensures effective training and adoption. Option A is correct because ownership-e.g., a trainer knowing they're responsible for content delivery-boosts accountability; if roles blur, tasks like scheduling sessions might slip, delaying readiness.
Option B is correct as transparency (e.g., who handles logistics) and visibility (e.g., roles listed in the plan) streamline decisions-e.g., the project manager can quickly assign a task knowing the enablement lead oversees it, avoiding confusion. Option C is correct because clarity on duties (e.g., "content developer creates materials") ensures everyone knows their part-without this, a key user training might lack materials due to unclear responsibility, risking go-live preparedness.
Option D is incorrect-roles don't describe the strategy (a separate document); they execute it. Option E is incorrect; tools (e.g., SAP Enablement Platform) are provided separately, not via role definitions. SAP OCM emphasizes role clarity for ownership, transparency, and execution efficiency.
"Clear enablement roles enhance ownership and accountability, increase transparency and visibility for decision-making, and ensure all involved understand their responsibilities" (SAP Activate, Enablement Framework, Role Definition Benefits).
NEW QUESTION # 63
What are typical sources of information for identifying stakeholder groups? Note: There are 3 correct answers to this question.
- A. Senior managers of impacted business units
- B. Employee representative or works council
- C. The project sponsor
- D. The HR department
- E. The IT department
Answer: A,C,D
NEW QUESTION # 64
What are possible options for setting up organizational change management in the project organization? Note:
There are 3 correct answers to this question.
- A. As a staff unit
- B. As a subproject
- C. As a separate project
- D. As a cross-topic
- E. As part of the functional sub-projects
Answer: B,C,D
NEW QUESTION # 65
What are possible options for setting up organizational change management in the project organization? Note:
There are 3 correct answers to this question.
- A. As a subproject
- B. As a separate project
- C. As a cross-topic
- D. As part of the functional sub-projects
- E. As a staff unit
Answer: A,C,E
Explanation:
OCM can be integrated into an SAP project in various ways. Option B is correct because treating OCM as a cross-topic ensures it spans all project areas (e.g., communication, training), aligning with SAP Activate's holistic approach. Option D is correct as a subproject allows OCM to have its own plan and resources under the main project. Option E is correct because a staff unit (e.g., reporting to the project lead) provides dedicated support without separate project status. Option A is incorrect-OCM is rarely a standalone project, as it supports the main implementation. Option C is also incorrect; embedding OCM in functional sub- projects dilutes its focus across technical areas.
Extract from SAP OCM Concepts: SAP Activate supports OCM as a cross-functional, subproject, or staff function to ensure alignment with project goals (SAP OCM Framework).
NEW QUESTION # 66
Which communication tasks usually fall into the area of responsibility of change management during the go- live phase of a cloud implementation? Note: There are 2 correct answers to this question.
- A. Inform external suppliers about key process changes
- B. Send out information about ad-hoc support options
- C. Collect requirements for workflow adjustments
- D. Organize a Q&A session for key users
Answer: B,D
Explanation:
During the go-live phase (SAP Activate Deploy phase), change management focuses on supporting end-users to ensure adoption and smooth transition. Option C is correct because organizing Q&A sessions for key users addresses immediate concerns, fosters confidence, and aligns with OCM's role in facilitating two-way communication. Option D is correct as sending out ad-hoc support information (e.g., helpdesk contacts) ensures users know where to turn for help, a critical task to sustain adoption post-go-live. Option A is incorrect-informing external suppliers is typically a business or procurement responsibility, not OCM's focus. Option B is also incorrect; collecting workflow adjustment requirements is a technical or process owner task, not a communication duty of change management. In SAP OCM, communication tasks at go-live prioritize user enablement and support over external or technical adjustments.
"In the Deploy phase, change management executes communication activities such as user Q&A sessions and support announcements to reinforce adoption and address immediate post-go-live needs" (SAP Activate Methodology, Change Management Workstream, Deploy Phase).
NEW QUESTION # 67
What are the benefits of different communication channels for the change communication in an SAP cloud project?
- A. Using already existing channels allows a fast internalization of conveyed messages, and establishing new channels reduces the alignment effort with the project lead.
- B. Using already existing channels reduces costs and effort, and establishing new channels helps to draw attention to the communicated content.
- C. Using already existing channels allows to communicate generic information, and establishing new channels helps to convey messages to younger users.
- D. Using already existing channels helps to point out what remains stable, and establishing new channels contributes to preventing an information overload.
Answer: B
Explanation:
Effective communication in SAP OCM leverages a mix of channels. Option A is correct because existing channels (e.g., company intranet) save resources, while new channels (e.g., project-specific newsletters) highlight critical updates, grabbing attention. Option B is incorrect-channel choice isn't age-specific, and
"generic information" isn't a key benefit. Option C is flawed; existing channels don't inherently signal stability, and new channels don't prevent overload. Option D is incorrect-internalization speed and alignment effort aren't primary benefits tied to channel type.SAP OCM advocates balancing efficiency and impact, making A the best fit.
"Utilize existing channels to minimize effort and cost, and introduce new channels to emphasize key messages and enhance visibility" (SAP OCM Framework, Communication Dimension).
NEW QUESTION # 68
Which aspects are usually documented in a communication channel analysis? Note: There are 3 correct answers to this question.
- A. Name and short description of the channel
- B. Frequency of use and owner of the channel
- C. Stakeholders or stakeholder groups targeted by the channel
- D. Estimated costs per change communication activity via the channel
- E. Degree of standardization required for the channel
Answer: A,B,C
Explanation:
A communication channel analysis in SAP OCM evaluates how channels support change communication.
Option C is correct because naming and describing each channel (e.g., "intranet - company news portal") clarifies its purpose and reach. Option D is correct as frequency of use (e.g., weekly updates) and ownership (e.g., HR team) define operational details and accountability. Option E is correct because identifying target stakeholders (e.g., key users, managers) ensures messages align with audience needs.
Option A is incorrect-"degree of standardization" is vague and not a standard aspect; channels are assessed for effectiveness, not uniformity. Option B is incorrect; while costs might be considered, they're not typically documented per activity in this analysis-budgeting is separate. SAP OCM uses this analysis to optimize communication delivery.
"A communication channel analysis documents channel names and descriptions, frequency and ownership, and targeted stakeholder groups to ensure effective messaging" (SAP OCM Framework,Communication Planning).
NEW QUESTION # 69
......
100% Guarantee Download C-OCM-2503 Exam Dumps PDF Q&A: https://www.prepawayete.com/SAP/C-OCM-2503-practice-exam-dumps.html
Kickstart your Career with Real Updated Questions: https://drive.google.com/open?id=1iYxDzZrhKqk_6tiEwMWHZktPG0Os3Asr